Creative Simulation Long Lead Soft Fishing Lure
$28.99
Before you choose
Check measurements, compatibility, and the selected option. Products ship through supplier partners and may arrive separately.
Product information:
Supply category: spot
Product Category: Fishing Bait
Material: Lead head + PVC injection
Size: 12cm
Packing: bagged
Weight: about 8.5g
Applicable people: general
Color: pink style, yellow body orange back style, red head luminous style, white style, transparent style
Features:
Exquisite workmanship, modeling simulation
Packing list:
Fishing lure*1
Image: